
Case Study
Powering London's Future: How FastDraft™ is Driving Success for National Grid’s £1bn London Power Tunnels Project
The £1 billion London Power Tunnels 2 (LPT2) project by National Grid is a forward-looking initiative to strengthen London’s power infrastructure, ensuring a reliable energy supply for the coming decades. Spanning 32.5km of underground tunnels, LPT2 will connect critical substations across the city to create a durable power network backbone. Commencing in 2020 and projected to finish in 2028, the project is managed through the NEC4 contract suite to foster collaboration, risk transparency, and operational efficiency.
The Challenge
Continue Reading


Anglian Water Streamlines NEC Contract Management with FastDraft
Read Case Study


Contract Success on £185m A9 Project with FastDraft and Transport Scotland
Read Case Study


How Translink Streamlined Contract Management to Deliver £340m Belfast Grand Central Station
Read Case Study


Mace Aviation Enhances Workforce Development and Compliance with Built Intelligence Training
Read Case Study