Transforming Dongdaemun Design Plaza with BIM
Dongdaemun Design Park and Plaza (DDP) is an incredible public space in the heart of Seoul, South Korea. But realising Zaha Hadid design was far from straight-forward. Here we take a look at how building information modelling (BIM) helped make the concept a reality.