Built Intelligence

Pillar 3: BS 1192-4 (COBie) | The 8 Pillars of BIM Level 2

Pillar 3: BS 1192-4 (COBie) | The 8 Pillars of BIM Level 2

John Eynon takes you through the 8 Pillars of BIM Level 2. Here he looks at Pillar 3: PAS 1192-4 (COBie). Filmed as part of B1M University at University of Westminster.