Delivering HS2 with BIM: Professor Andrew McNaughton
We've decided to bet the shop on building information modelling (BIM) - Join Professor Andrew McNaughton, Technical Director of High-Speed Two (HS2), for a look at how BIM is shaping the design, delivery, operation and maintenance of Britain's latest high-speed railway.
After studying this course, you should be able to:-
1. Apply some of the practical tips to your next projects.
2. Avoid some of the common pitfalls highlighted.