Understanding APC Routes – By Jen Lemen

At the beginning of your APC journey, you may be left confused by the myriad of routes and pathways that are available to you. How do you know which to choose and how do you know that it is the right option for you?

In this blog, we demystify the various APC routes which are available for you to consider. We give practical advice on which may better suit your needs and how you can seek success in your APC.

What is the difference between a route and a pathway?

This article is going to focus on the various APC routes; these are effectively the entry points into the APC assessment process based on your prior experience, qualifications and any other professional memberships.

The sector pathways are slightly different, relating to your specific area of practice, e.g. Quantity Surveying & Construction, Building Surveying, Planning & Development and Commercial Real Estate.

What routes are available?

The RICS website provides the starting point for the various routes available to you; https://www.rics.org/uk/surveying-profession/join-rics/chartered-member-mrics/.

However, figuring out which is right for you can be a challenge!

Below are summarised the various routes available for the APC:

  • APC (what we will call the ‘traditional’ routes) – Structured Training, straight to assessment and preliminary review.
  • Senior Professional Assessment;
  • Specialist Assessment;
  • Academic Assessment;
  • Direct Entry;
  • AssocRICS Progression.

What are the ‘traditional’ APC routes?

The ‘traditional’ APC routes, i.e. not Senior Professional, Specialist or Academic, are split into four main categories:

  • Structured Training (24 months/minimum 400 days experience) – RICS-accredited degree and no prior experience, i.e. usually pursued by recent graduates.
  • Structured Training (12 months/ minimum 200 days experience) – RICS-accredited degree and at least 5 years’ relevant experience, i.e. typically pursued by more experienced candidates or those who have undertaken a part-time or distance learning degree course;
  • Straight to Assessment – RICS-accredited degree and at least 10 years’ relevant experience, i.e. experienced candidates who are still doing technical day to day work rather than occupying a senior professional role;
  • Preliminary Review – Non-cognate degree or membership of an RICS approved professional body and at least 5 years’ relevant experience, of which 12 months must have been post-graduation.

The main differences between these are that:

  • Structured Training candidates need to keep a diary recording their experience. This is not required by Preliminary Review or Straight to Assessment candidates
  • Preliminary Review candidates need to submit their Preliminary Review submission roughly 4-6 months prior to submitting their final assessment. This provides a quality assurance check for RICS via an assessed written submission. The documents submitted are the same as those submitted for final submission, i.e. Summary of Experience, Case Study and CPD Record.

What are the three other routes?

The Senior Professional, Specialist and Academic routes have different assessment requires to the ‘traditional’ routes above.

The Senior Professional Route requires you to have at least 10 years’ relevant experience, reduced to 5 if a postgraduate degree is held. Your role must include senior professional responsibilities, including leadership, management of people and management of resources.

The Specialist Assessment also requires at least 10 years’ relevant experience, again reduced to 5 if a postgraduate degree is held. You will also need to have advanced responsibilities for a specialist or niche area of work.

The Academic Assessment is appropriate for academic professionals, e.g., lecturers or researchers, with at least 3 years’ academic experience and a surveying-related degree.

The RICS have a vetting procedure for each of these routes which you must pass before being admitted onto the route. If you do not pass this procedure, then RICS are likely to advise that one of the ‘traditional’ routes are more suitable, e.g. if your senior professional role is not considered to be suitably senior.

What is Direct Entry?

Direct Entry is available for candidates with qualifications or other professional body memberships which RICS consider are appropriate to either allow candidates to apply directly for assessment or to apply via Preliminary Review, e.g. MCIOB. A full list is available on the RICS website; https://www.rics.org/uk/surveying-profession/join-rics/direct-entry-to-rics-membership/.

What is AssocRICS progression?

This is available if you already hold the AssocRICS membership, however, we understand that this route is currently under review by RICS. It requires 4 years’ post-AssocRICS experience and completion of 900 study hours from the final year of an RICS-accredited degree course.  This is followed by the APC submission and final assessment interview.

What common pitfalls are there? 

  • Candidates are not always aware of the Senior Professional route, which is often more suitable for those with key decision making or leadership roles;
  • Equally, candidates who do not truly have a Senior Professional role should avoid this route as the level of questioning and scrutiny will be inappropriate. In this case, one of the ‘traditional’ routes would be more appropriate;
  • Candidates sometimes have the option of either Preliminary Review or Structured Training – if you have an RICS-accredited degree then we would generally advise against Preliminary Review as it adds an extra element of uncertainty into the process;
  • Existing AssocRICS members may have more than one route option available and all should be explored to choose the right one for you.

If in doubt, contact RICS or Built Intelligence to discuss which route may be right for you.

How can I choose the right route?

  • Seek early advice;
  • Speak to other candidates to find out about their experiences of each route;
  • Make the right decision for you, not anyone else;
  • Read up on the RICS website about each route – do your own due diligence and research first!
8 Mar, 2021
Why I Joined Built Intelligence and What I’ll Be Writing About

Why I Joined Built Intelligence and What I’ll Be Writing About

Genna Rourke joined Built Intelligence as Industry Engagement Director in January 2026. With nearly twenty years’ experience across quantity surveying and commercial leadership, Genna brings first-hand industry perspective to our work across FastDraft, Academy and wider thought leadership. In this new series, she will share practical views on the challenges construction teams face in contract management, capability development and commercial control.   Hello. Here’s who I am and why I’m writing.   I joined Built Intelligence in January 2026 as Industry Engagement Director. Before that, I spent nearly twenty years working as a quantity surveyor and commercial leader across infrastructure, civil engineering and contractor environments. I am a Chartered QS, MRICS and FCInstCES,...

read more
FastDraft: Setting up NEC contracts for success

FastDraft: Setting up NEC contracts for success

The early days of an NEC contract set the tone for everything that follows. Yet, on many projects, the first 90 days are where discipline slips, processes drift, and risk quietly builds. Teams attend training. They understand the contract. They start with good intentions. But as delivery pressures increase, the gap between what people know and what they actually do begins to widen. That gap is where projects lose control. FastDraft closes it. By embedding structure, prompts and accountability directly into the workflow, it turns NEC knowledge into consistent, repeatable behaviour from day one.   Behaviour vs documentation   NEC contracts are designed around proactive management, clear communication and strict timescales. Success depends less on what is written and more on how...

read more
5 things you need to do in the first 90 days of your NEC Contract

5 things you need to do in the first 90 days of your NEC Contract

When it comes to NEC contracts, the first few weeks of a project set the tone for the entire delivery. Many disputes, delays, and unnecessary costs originate not from technical complexity but from overlooked processes, unclear roles, and poor documentation right at the start. NEC4 is designed for proactive management. If you treat it like a traditional contract and “sort it out later”, you risk compounding small issues into major problems.Small Mistakes, Big Consequences Early inconsistencies in NEC4 contracts can escalate quickly. Common examples include: Incomplete Contract Data – Missing dates, unclear roles, or unvalidated options can cause confusion when a time-critical decision arises. Uncoordinated Scope / Works Information – Ambiguities in what needs delivering often surface as...

read more